Power Poles NSW installs temporary builders power poles for construction, renovation and development sites across NSW.
Before permanent power is ready, a building site still needs safe and reliable access to electricity for tools, trades, site offices and construction activity.
The team can help plan the temporary pole location, install the builders supply pole and coordinate related Level 2 electrical works where required.
What is temporary builders power?
Temporary builders power provides a short-term electricity supply to a construction, renovation or development site before the permanent electrical connection is ready.
It can provide power for tools, trades, temporary lighting, site offices and other construction requirements. The setup may involve a temporary builders pole, metering, service lines and Level 2 electrical works depending on the property and existing connection.
Once construction progresses and the permanent supply is ready, the temporary arrangement is removed, altered or transitioned to the permanent connection as required.
Temporary builders power scenarios
Temporary builders power may be needed when a site requires short-term electricity during construction, demolition, renovation or development works.
Power for a new build
For residential, rural or commercial construction sites that need electricity before permanent supply is completed.
Demolition or renovation
For projects where the existing supply needs to be changed, isolated or replaced before building works can continue.
Temporary site pole
For tools, trades, site offices, temporary lighting and general construction power requirements.
Connection coordination
For temporary supply works that involve service lines, metering, disconnection, reconnection or Level 2 electrical requirements.
Temporary builders power should be planned before the site slows down.
Power Poles NSW can help organise a temporary pole setup that suits the site, the construction timeline and the required connection pathway.
Get a quotePractical support for construction site power
Temporary builders power needs to be set up around real site conditions. Access, timing, pole position, connection requirements and trade activity all need to work together.
Builder-friendly planning
Support for site timing, access, temporary pole position and construction sequencing.
Temporary pole installation
Installation of builders supply poles for construction, renovation and development sites.
Level 2 electrical capability
Coordination of related connection, disconnection, metering or service works where required.
NSW-wide site support
Support for residential, rural, commercial and project sites across NSW.
Temporary builders power in Ausgrid & Endeavour Energy areas
Temporary builders power needs to meet the connection requirements of the electricity network servicing the construction site.
Across Sydney and surrounding NSW regions, this commonly includes Ausgrid and Endeavour Energy. Depending on the site and existing supply, the project may involve a new or modified connection application, temporary metering, service lines, disconnection or reconnection and Level 2 ASP electrical works.
Power Poles NSW can assess the proposed temporary supply arrangement and coordinate the pole and associated Level 2 electrical works required for the site.
Does Temporary Builders Power Require a Level 2 Electrician?
It can. Level 2 ASP electrical work may be required where temporary builders power involves connecting service lines, disconnecting or reconnecting an existing supply, metering or other contestable connection works.
The exact requirements depend on the site, existing electricity supply and the network servicing the property.
Temporary builders power vs permanent power
Temporary builders power is designed to provide electricity while construction is underway and before the property's permanent electrical supply is ready.
Permanent power is the final supply arrangement that remains once the building work and electrical connection requirements are complete.
Planning the temporary and permanent connection pathways together can help avoid unnecessary changes as the project progresses.
Equipment ready for temporary site pole installation
Temporary builders power often needs to be installed around changing site access, early construction works and tight project timelines. The custom pole truck combines crane, lift and hydraulic auger capability, helping the team drill, lift, position and install temporary poles with more control on site
A clear process for temporary builders power
Temporary builders power works best when it is planned early. Power Poles NSW follows a clear process to understand the site, confirm the temporary supply needs and coordinate the required pole and Level 2 works.
-
Review the site
Understand the construction stage, access, existing supply, proposed works and temporary power needs.
-
Plan the setup
Confirm the temporary pole location, equipment requirements and connection pathway.
-
Install the temporary pole
Complete the pole installation and prepare the site for the required temporary supply arrangement.
-
Coordinate completion
Support the required Level 2 electrical works, checks and next steps toward the permanent supply pathway where applicable.
More support for construction power works
Temporary builders power can also involve new pole installation, overhead or underground connection work, relocations or broader Level 2 electrical support.
Private power pole installation
Installation and replacement of private poles for homes, rural properties and commercial sites.
Read moreOverhead and underground connections
Level 2 electrical support for private overhead and underground power connection works.
Read morePole upgrades and relocations
Pole relocation and upgrade works for driveways, renovations, access changes and property improvements.
Read moreTurnkey Level 2 solutions
Coordinated pole installation and Level 2 electrical works through one capable team.
Read moreTemporary Builders Power FAQs
Temporary builders power provides a short-term electricity supply to a construction, renovation or development site before the permanent electrical connection is ready. It can provide power for tools, trades, lighting, site offices and other construction activities.
Temporary builders power may be required when a construction site needs electricity before the permanent supply is available. This commonly applies to new builds, demolition projects, major renovations and developments where the existing electricity supply has been removed, disconnected or altered.
Often, yes. Level 2 ASP electrical work may be required where temporary builders power involves service lines, disconnection or reconnection, metering or other work associated with the connection between the property and electricity network. The exact requirements depend on the site, existing supply and proposed temporary connection.
A network connection application may be required depending on the property and proposed temporary supply. Ausgrid provides temporary builder’s services through its new or modified connection process. In Endeavour Energy areas, temporary builder’s supply applications are managed through its Connections Portal and may require a Temporary Builder’s Supply NMI.
Yes. Temporary power can be useful where an existing electricity supply needs to be disconnected, isolated or altered before demolition or renovation works begin. The temporary connection can provide site power while construction progresses and before the permanent electrical supply is established.
The position depends on the property layout, construction plans, site access, electricity network connection and future building works. The pole should be planned early so it remains accessible and does not interfere with excavation, driveways, building footprints or construction access as the project progresses.
Temporary builders power is intended to provide electricity during construction and is not generally intended to remain as the site's permanent supply arrangement. Endeavour Energy specifically states that temporary builder’s supplies are not approved for continued permanent supply. The permanent connection should therefore be considered when planning the temporary setup so the transition can be coordinated efficiently.
The cost varies depending on the pole installation, site access, connection type, existing electricity supply, metering requirements and Level 2 electrical work required. A straightforward temporary pole installation can involve a different scope from a project requiring disconnection, new service lines or changes to an existing network connection. A site-specific assessment is the best way to obtain an accurate quote.
The timeframe depends on the site, electricity network, connection application and Level 2 works required. Simple projects may progress relatively quickly, while projects requiring network approvals, additional documentation or connection works can take longer. Endeavour Energy advises that temporary supply approval can range from a few days to several weeks depending on the complexity of the application.
Yes. Power Poles NSW can coordinate the temporary power pole installation and associated Level 2 electrical works, including connection, disconnection, reconnection and service requirements where applicable. This provides builders, developers and property owners with one team to coordinate the pole and electrical components of the temporary power setup.